Welcome — What Matters Most to You?

We want this to be an interactive presentation. Tell us your top priority for Pollard and we'll make sure we address it as we go.

David Billings

OPM — Hill International / Lyro
Schedule / Milestones
MBTA Coordination
Risk Management
Budget / GMP
Preconstruction Process

Lynn Denninger

Managing Director — Canon Design
Community Impact
Vote Support
Design Collaboration
Sustainability
Student Safety

Tina (HMFH Architects)

Architect — HMFH
Design Review Process
Precon Responsiveness
Cost Control / VE
Site Logistics
Sustainability

Hank Haff

Facilities Director — Town of Needham
Occupied Campus Safety
Schedule Certainty
Budget Confidence
Construction Logistics
School Operations

Meryl Nessler

Architect — Studio G
Design Coordination
Phased Construction
Sustainability
Community
Fontaine + Dimeo
Pollard Middle School
We didn't come here to tell you what we've done. We came to show you what we've already started doing for Pollard.
200
Years Combined
$3M+
Savings
1 Year
Faster
Net Zero
Ready
Q1Why were your key staff selected? Reference experience, management styles, and skill sets.
JOEL KENT
YOUR TEAM
Why These People for Pollard
JK
Joel Kent, PE
Project Exec
MW
Matt Wilder
Superintendent
CM
Chelsey Mutrie
VP Precon
MH
Mark Hogan
Sr. Super
FR
Frank Reynolds
Dimeo Precon
JV
JoEllen Villari
MBTA Liaison
DJ
Danielle Judge, PE
Design Review
MA
Mark Abdella
Vote Support
PROJECT EXEC

Joel Kent, PE, CPHB

Creative phasing & cost control. Passive House certified. Pollard is his #1 priority.

SUPERINTENDENT

Matt Wilder

100% dedicated. "Dance floor" auditorium method. Builds the 750-seat theater.

VP PRECON

Chelsey Mutrie

Owns the budget SD to closeout. Agawam geothermal redesign — $1M saved. 4 estimators.

VOTE SUPPORT

Mark Abdella

VP CM Services. Lives in Needham. Community outreach & Town Meeting strategy.

JOEL KENT
UNDERSTANDING YOUR PROJECT
The Decisions That Shaped Pollard
1

Remaining at Pollard

Occupied campus construction, phased logistics, zero disruption to school operations.

2

Reuniting Grades 6–8

Frees High Rock and Mitchell for their next chapter. Changes the program and community dynamics.

3

Preserving the Auditorium

750-seat community theater. Requires specialized construction — Matt Wilder's method makes it buildable.

These three decisions shaped every recommendation in our proposal. We started with understanding why this project exists. Every phasing plan, logistics decision, and cost estimate flows from here.

JOEL KENT
BEFORE WE PROPOSED
Things We Assessed

An Estimate Alone

We developed a layered conceptual dashboard — every dollar has a benchmark source and MSBA reimbursability tag.

Single-Phase Construction

Site constraints + MBTA adjacency make phased construction the right answer. We optimized phasing to save a full year.

Dedicated Path to DeFazio

Dedham Ave & Great Plain Ave provide safer, less disruptive access without impacting residential streets.

Plan Without Warner Field

Consolidating ~120 wells at Warner Field: single-mobilization, ~$1M savings, zero noise near school or homes.

Q3Describe your approach to construction logistics and safety including pedestrian and vehicular movement.
LET IT PLAY
4D CONSTRUCTION SEQUENCE
Watch How We Build Pollard
This isn't a marketing piece. This is the phasing plan we developed for your site.
Q2Present a case study from comparable projects. Address challenges, VE, precon services, and lessons learned.
JOEL KENT
CASE STUDY
Doherty Memorial HS & South High
CURRENTLY UNDER CONSTRUCTION

Doherty Memorial HS — $268M JV

422,000 SF. New HS on occupied campus. Regional Best Project. Same JV, same systems.

COMPLETED — LEED GOLD

South High Community School

LEED Gold. Complex occupied site, phased construction, community engagement. Direct parallels to Pollard.

Doherty South HS

“I believe our community would be in good hands.”

— Erick Backstran, AECOM — Needham Resident
Q2fHow has your team managed the CMR role in achieving sustainability goals?
JOEL KENT
SOUTH HIGH — LEED GOLD
What LEED Gold Looks Like Up Close
LEED DetailLEED DetailLEED Detail LEED DetailLEED DetailConstruction
Q2aDescribe challenges encountered and how your firm addressed them.
CHELSEY MUTRIE
GEOTHERMAL STRATEGY
Warner Field: $1M in Savings
$1M+

Savings from Relocation

Single mobilization, simplified dewatering, drilling away from students and neighbors.

$4.6M

Agawam HS Verified

149 boreholes. $4.575M field + $1.155M heat pumps + $300K mech room. Chelsey redesigned 180→150 wells.

Geothermal
Q3Provide examples of dealing with MBTA right of ways.
JOELLEN VILLARI / FRANK REYNOLDS
MBTA NEEDHAM LINE
Dedicated Liaison. Defined Cost.

Rail Interface Access Plan

ROW training, credential verification, flagging. Every worker trained & badged before touching the site.

30–45 Day Licensing

We know the MBTA review timeline. We plan around it. Flagging budgeted as defined cost, not contingency.

775 Huntington — $86.5M

Green Line adjacent. Full MBTA coordination. Dimeo led all rail interface operations.

Avenir — $107M

Green Line / North Station. Transit-adjacent construction in Boston's most constrained sites.

MBTA Process
Q3Describe your approach to construction logistics and safety on an occupied site.
MATT WILDER / JOEL KENT
OCCUPIED CAMPUS
Pollard Stays Open. Students Stay Safe.

Separate Entrance

All construction via Dedham Ave / Great Plain Ave to I-95. Zero vehicles near school entrance.

Bus Loop Protected

Maintained all phases. Safe walking/biking paths. Drop-off never disrupted.

MORE Parking

Net increase at every stage. Harris Ave expansion + temporary lots. Warner Field parking in Phase 2.

DeFazio Preserved

Only Warner Field used. All other fields operational. Fully restored at completion.

Emergency Protocols

Life safety updated per phase. Fire dept walkthroughs. All workers background-checked.

Noise & Hours

Impact work during school hours. Restricted weekends. Seasonal adjustments for test seasons.

Q4Present your proposed schedule. Describe early packages and why they are important.
JOEL KENT
SCHEDULE ACCELERATION
One Full Year Faster
PHASE 1
Jul 2027

NTP — 8 months earlier

Complete Dec 2029. Students move in over winter break.

PHASE 2
Aug 2031

Complete — 11 months earlier

Demo, foundations, Grade 6 Academy. Warner Field restored.

4 Early Release Packages

ERP 1: Site enabling & geothermal (Apr 2027) • ERP 2: Sitework & concrete (Aug 2027) • ERP 3A: Structural steel (Nov 2027) • ERP 3B: Long-lead electrical

Mar 2026CM Award
Apr 2026SD Cost Estimate / VE
Jun 2026MSBA Board Vote
Oct 2026Town Meeting & Override
Jul 2027NTP — Phase 1 begins
Mar 2028GMP established
Dec 2029Phase 1 complete
Aug 2031Project complete
Q2bHow did your team work with the design team on VE during preconstruction?
Q2cHow did precon services achieve client priorities within funding limits and MSBA requirements?
CHELSEY MUTRIE / DANIELLE JUDGE
PRECONSTRUCTION
Not Just Milestones. Micro-Estimates on Demand.
When the design team asks “what if?” we respond in days, not months.
SD

Cost & Constructability

MSBA benchmarks. Trade input. Early procurement roadmap.

DD

MEP Coordination

Clash detection. Risk ID. Brian Davies reviews every mech system.

60% CD

Sub Prequalification

Comprehensive estimates. Scope boundaries. Start qualifying subs now.

90% CD

Defensible GMP

Real costs from self-performed work. Bid-day RFIs. Procurement schedule.

Structural Coordination
CHELSEY MUTRIE
DEDICATED RESOURCES
In-House Preconstruction Team
Precon Team
Q2dShare thoughts on cost trends, the local sub market, and ways to leverage these.
JOEL KENT / DAVE FONTAINE JR.
THE DIFFERENTIATOR
The Only Firm That Builds AND Manages

FONTAINE + DIMEO — CM + GC

Direct contracts with Div 10 subs, door hardware, fencing, SOE
Data flows directly — no middleman
Wider sub pool — subs who skip CM-only firms bid us
GMP from actual build costs, not management estimates
Self-perform on critical path work
Insurance & compliance verified directly on every sub

TRADITIONAL CM-ONLY

Small subs bundled under drywall/general trades
Information filters through sub tiers
Same sub pool as every large CM firm
Estimates based on market intel, not self-performed
Dependent on subs for all field work
Compliance delegated to prime subs
JOEL KENT
TEMPORARY CLASSROOMS
Pollard's Modular Solution
20 classrooms, 4 bathrooms, 1 admin. Install May–Sep 2027. Remove Summer 2030.
OPTION 1

Relocate + Supplement

Move district-owned modulars. Lowest cost, fastest mobilization.

OPTION 2

Acquire Pre-Owned

Purchase from Watertown (40), Nauset (30), Winchester (20), Webster (20).

OPTION 3

Procure New

Custom-built to Pollard specs. Highest quality. May serve district beyond this project.

Modular Options
MARK ABDELLA
COMMUNITY & VOTE SUPPORT
How Information Travels in Needham
Needham Social Circles

Mark Abdella — Your Neighbor

Lives in Needham. In the school system peer group. Accountable personally, not just professionally.

Community Advisory Network

Elementary schools, faith communities, PTOs, town sports. Pre-construction meetings, monthly mailers, QR-code visualization.

DAVE FONTAINE JR.
TECHNOLOGY IN ACTION
We Built This For Your Project
davefontaine.ai/needham
davefontaine.ai/needham

Project Website

Built in-house. Construction updates, traffic, noise, team bios, phase explorer.

AI Q&A (Udor)

Community questions answered 24/7. Best human communication, enabled by tech.

Cost Dashboard

Layered estimates. MSBA reimbursability. Verified benchmarks from 4 projects.

4D Animation

Shareable via QR code at Town Meeting. Every phase visualized with voiceover.

This committee has lived through the downside of projects perceived as not well communicated. We control this platform. We customize it. Coordinated messaging — you never hear conflicting information.
Q2eProvide applicable lessons learned from Design, Preconstruction, Construction, Occupancy, and Closeout.
JOEL KENT
TRACK RECORD
Don't Take Our Word for It
JV — UNDER CONSTRUCTION

Doherty Memorial HS

$268M. 422K SF. Occupied campus. Regional Best Project. Fontaine + Dimeo together.

GEOTHERMAL

Agawam High School

235K SF. Chelsey redesigned geo from 180→150 wells. $1M+ saved. MSBA press tour.

OCCUPIED CAMPUS

Walpole Middle School

162K SF. 3 years. $95.3M GMP. Dance floor auditorium. Key benchmark for Pollard.

14 FT FROM SCHOOL

Mountain View K–8

177K SF. Two-phased. 14 feet from occupied school. Studio G was design associate.

“Working with Fontaine + Dimeo has been a seamless experience.”

— Russ Adams, City of Worcester
Q2fHow has your team managed achieving project sustainability goals?
TRACY ROUTHIER
SUSTAINABILITY & CLOSEOUT
Net Zero Ready. LEED Gold.
~25

Target EUI

All-electric. Ground-source heat pumps. Solar-ready.

63

LEED Points

Gold pathway. Indoor air quality. Low-emitting materials.

100%

Commissioning

Testing all equipment beyond MSBA requirements.

Year 1

Monitoring

Every installer includes full year of service. BAS verified.

Sustainability
THREE THINGS TO REMEMBER
When you walk out of this room, remember this.
1

Already Thinking Like Your CM

We assessed options before we proposed. We built tools before you asked.

2

Only Firm That Builds AND Manages

Wider sub pool. Lower costs. Direct risk control. Real GMP.

3

Families, Not a Corporation

200 years combined. One of us lives here. Pollard is our highest priority for 3 years.

Questions?
davefontaine.ai/needham
Explore Project Site → Ask Udor
Udor
BY FONTAINE + DIMEO
Hi! I'm Udor. Ask me anything about our Pollard proposal — team, schedule, geothermal, MBTA, costs, or anything else.